PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Close up Shear Wall forms at Elev. 5-6 2nd Floor Facing South (800x600).jpg Pouring Concrete at Monumental Stair Wall forms Facing South-East (800x600).jpg Pouring concrete at Monumental stair wall froms Facing East -2 (800x600).jpg Pouring concrete at Monumental stair wall froms Facing East (800x600).jpg Back side of the Curtain Wall Mockup  (800x600).jpg Curtain Wall Mockup  (800x600).jpg Front side of the Curtain Wall Mockup  (800x600).jpg
Previous pageNext page Pouring concrete at Monumental stair wall froms Facing East -2 (800x600)
Pouring concrete at Monumental stair wall froms Facing East -2 (800x600)